Resource Type

Journal Article 175

Year

2023 8

2022 6

2021 11

2020 10

2019 11

2018 14

2017 16

2016 7

2015 9

2014 8

2013 11

2012 4

2011 8

2010 12

2009 2

2008 2

2007 8

2006 3

2005 4

2004 2

open ︾

Keywords

building information modeling 6

BIM 3

China 3

Sutong Bridge 3

building 3

project management 3

seismic response 3

Building 2

Building Information Modeling 2

Occupant 2

TGP 2

commercial building 2

green building 2

industrial building 2

lean construction 2

low-rise building 2

office building 2

residential building 2

sustainability 2

open ︾

Search scope:

排序: Display mode:

Scheme comparison on large-scale infrastructure construction in shoal areas

Xian Zhengquan,Liang Jinda,Zhao Lei

Strategic Study of CAE 2010, Volume 12, Issue 4,   Pages 29-32

Abstract: style="text-align: justify;">This article described the successful experience of using steel sheet pile cofferdamon building island as pile installation platform.Constructing steel pile cofferdam in advance on cap construction instead of steel platform can reduce

Keywords: shoal area     large-scale infrastructure     steel sheet pile     cofferdam on building island    

Phase Ⅲ RCC Cofferdam Construction of TGP

Zhang Shuguang

Strategic Study of CAE 2003, Volume 5, Issue 11,   Pages 79-81

Abstract:

The phase Ⅲ RCC cofferdam construction belongs to the phase Ⅲ diversion works.construction site and duration, both the concreting intensity and the rise height of the phase Ⅲ RCC cofferdam

Keywords: TGP     RCC cofferdam     concrete    

Avoiding the innovation island in infrastructure mega-project

Hongquan CHEN, Quanke SU, Saixing ZENG, Daxin SUN, Jonathan Jingsheng SHI

Frontiers of Engineering Management 2018, Volume 5, Issue 1,   Pages 109-124 doi: 10.15302/J-FEM-2018073

Abstract: We propose a framework to analyze the formation mechanism of the IMP innovation island from three dimensions—theWe look at the Hong Kong-Zhuhai-Macao Bridge project to elaborate the innovation island concept that

Keywords: diversity of innovation bodies     life-cycle dynamics     the unique and temporary nature of IMPs     innovation island    

Science and Technology Innovation of the Deep Water High Earth-rock Cofferdam in the Three Gorges Project

Dai Huichao

Strategic Study of CAE 2003, Volume 5, Issue 7,   Pages 11-16

Abstract:

The deep water high earth-rock cofferdam in the 2nd phase construction of TGP is a hard and challengeDuring the period from 1998 to 2002, the cofferdam protected the construction pit of the left-bank damThe quality of the cofferdam is good, and it fulfilled the historical tasks satisfactorily.research, the design and construction, the organization and management, the safety monitor and the cofferdam

Keywords: TGP     deep water high earth-rock     cofferdam     design constraction    

A DSS for Management on the Jointly Discharging of Overtopped Cofferdam

Fang Debin,Wang Xianjia,Hu Zhigen

Strategic Study of CAE 2003, Volume 5, Issue 1,   Pages 62-68

Abstract:

Management on the jointly discharging of overtopped cofferdam is a typical semi-structured problemdecision support system is designed to address the management on the jointly discharging of overtopped cofferdam

Keywords: overtopped cofferdam     construction diversion management     decision support system (DSS)    

The lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam

Zhang Xiongwen,Ren Huixing

Strategic Study of CAE 2010, Volume 12, Issue 2,   Pages 22-26

Abstract: construction condition of deep water and high speed current, the exactly construction of the steel cofferdamThis paper discussed the lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdamIn which, the design combined the coping of bored piles construction platform with bottom of steel cofferdam

Keywords: Sutong Bridge     large steel cofferdam     fabrication     lowering as a whole     synchronousness controlling    

Piezoresistive pressure sensor with high sensitivity for medical application using peninsula-island structure

Tingzhong XU, Hongyan WANG, Yong XIA, Zhiming ZHAO, Mimi HUANG, Jiuhong WANG, Libo ZHAO, Yulong ZHAO, Zhuangde JIANG

Frontiers of Mechanical Engineering 2017, Volume 12, Issue 4,   Pages 546-553 doi: 10.1007/s11465-017-0447-9

Abstract: micro-electromechanical systems piezoresistive pressure sensor with a diagonally positioned peninsula-island

Keywords: MEMS     low pressure sensor     peninsula-island     ultra-high sensitivity     medical application    

The Hong Kong–Zhuhai–Macao Island and Tunnel Project

Ming Lin, Wei Lin

Engineering 2017, Volume 3, Issue 6,   Pages 783-784 doi: 10.1016/j.eng.2017.11.003

Innovation Ecosystem for Green Smart City Building in China

Jin Chen

Frontiers of Engineering Management 2015, Volume 2, Issue 4,   Pages 325-330 doi: 10.15302/J-FEM-2015058

Abstract: paper, based on the case study by the Insigma Group, tries to explore the rules of innovation ecosystem building

Keywords: green smart city     resource     innovation ecosystem building    

Comparative analysis of energy use in China building sector: current status, existing problems and solutions

Shengyuan ZHANG, Xiu YANG, Yi JIANG, Qingpeng WEI,

Frontiers in Energy 2010, Volume 4, Issue 1,   Pages 2-21 doi: 10.1007/s11708-010-0023-z

Abstract: China is the second largest energy user, yet the situation of energy use in the China building sector

Keywords: building energy use     lifestyle and technology     residential building     commercial building     rural building    

Influence of envelope insulation materials on building energy consumption

Junlan YANG, Jiabao TANG

Frontiers in Energy 2017, Volume 11, Issue 4,   Pages 575-581 doi: 10.1007/s11708-017-0473-7

Abstract: is established to clarify the primary energy use for production of the insulation materials and for building

Keywords: building envelope     insulation materials     energy consumption     payback time    

Impact of climate change on building heating energy consumption in Tianjin

Cao XIANG, Zhe TIAN

Frontiers in Energy 2013, Volume 7, Issue 4,   Pages 518-524 doi: 10.1007/s11708-013-0261-y

Abstract: This paper investigated the variation of building heating energy consumption caused by global warmingA TRNSYS simulation model for a reference building was introduced to investigate historical variationof office building energy consumption.By conducting principal component analysis and regression analysis, future variation of building heating

Keywords: global warming     office building     heating energy consumption    

Facility managers’ perceptions on building performance assessment

Rafaela BORTOLINI, Núria FORCADA

Frontiers of Engineering Management 2018, Volume 5, Issue 3,   Pages 324-333 doi: 10.15302/J-FEM-2018010

Abstract:

During the operational phase, building performance may decrease in various areas, so that the endThe results revealed that the core indicators used to measure a building’s operational performance areThese indicators and their sources can contribute to a better analysis of building performance and thedefinition of measures to improve performance during the operational phase of a building.

Keywords: building performance     facility management     non-residential buildings    

Machine learning in building energy management: A critical review and future directions

Frontiers of Engineering Management 2022, Volume 9, Issue 2,   Pages 239-256 doi: 10.1007/s42524-021-0181-1

Abstract: Over the past two decades, machine learning (ML) has elicited increasing attention in building energyresearch has not been clearly defined, and no thorough review of ML applications in BEM during the whole buildingintegration management of renewable energy, (3) security concerns of ML-BEM, (4) extension to other building

Keywords: building energy management     machine learning     integrated framework     knowledge evolution    

A Floating Island Treatment System for the Removal of Phosphorus from Surface Waters Article

Mark T. Brown,Treavor Boyer,R.J. Sindelar,Sam Arden,Amar Persaud,Sherry Brandt-Williams

Engineering 2018, Volume 4, Issue 5,   Pages 597-609 doi: 10.1016/j.eng.2018.08.002

Abstract: Once isolated process testing was complete, a floating island treatment system (FITS) was designed and

Keywords: Phosphorus removal     Lake ecosystem     Floating island treatment    

Title Author Date Type Operation

Scheme comparison on large-scale infrastructure construction in shoal areas

Xian Zhengquan,Liang Jinda,Zhao Lei

Journal Article

Phase Ⅲ RCC Cofferdam Construction of TGP

Zhang Shuguang

Journal Article

Avoiding the innovation island in infrastructure mega-project

Hongquan CHEN, Quanke SU, Saixing ZENG, Daxin SUN, Jonathan Jingsheng SHI

Journal Article

Science and Technology Innovation of the Deep Water High Earth-rock Cofferdam in the Three Gorges Project

Dai Huichao

Journal Article

A DSS for Management on the Jointly Discharging of Overtopped Cofferdam

Fang Debin,Wang Xianjia,Hu Zhigen

Journal Article

The lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam

Zhang Xiongwen,Ren Huixing

Journal Article

Piezoresistive pressure sensor with high sensitivity for medical application using peninsula-island structure

Tingzhong XU, Hongyan WANG, Yong XIA, Zhiming ZHAO, Mimi HUANG, Jiuhong WANG, Libo ZHAO, Yulong ZHAO, Zhuangde JIANG

Journal Article

The Hong Kong–Zhuhai–Macao Island and Tunnel Project

Ming Lin, Wei Lin

Journal Article

Innovation Ecosystem for Green Smart City Building in China

Jin Chen

Journal Article

Comparative analysis of energy use in China building sector: current status, existing problems and solutions

Shengyuan ZHANG, Xiu YANG, Yi JIANG, Qingpeng WEI,

Journal Article

Influence of envelope insulation materials on building energy consumption

Junlan YANG, Jiabao TANG

Journal Article

Impact of climate change on building heating energy consumption in Tianjin

Cao XIANG, Zhe TIAN

Journal Article

Facility managers’ perceptions on building performance assessment

Rafaela BORTOLINI, Núria FORCADA

Journal Article

Machine learning in building energy management: A critical review and future directions

Journal Article

A Floating Island Treatment System for the Removal of Phosphorus from Surface Waters

Mark T. Brown,Treavor Boyer,R.J. Sindelar,Sam Arden,Amar Persaud,Sherry Brandt-Williams

Journal Article